Follow The Link To Join Our WhatsApp Fan Page

 

The electricity company of Ghana (ECG) has in a recent post released the timetable for the load shedding which is supposed to take place in some part of Accra from 10th to the 17th of May,2021

The load shedding has been categorized into four groups namely; Group A,B,C and D with each group expected to have their light been turned off 6 am to 6pm each day.

ECG’s schedule for the load shedding comes after the recent outages which led to many people calling for them to come out and give them a routine that would be used to switch off lights in some parts of the country.

Some parts of Accra which would be affected by the current loading shedding includes; Nsakina, Dansoman,lower McCarty,Abossay okai, Amasaman,Bortianor,Tettegu, Nyamekye, Odorkor amongst many others.

See picture below;

WhatsApp Image 2021 05 03 at 11.25.33 AM - ECG Releases Dumsor Timetable From 10th To 17th May

Disclaimer: Opinions expressed here are those of the writers and do not reflect those of Youngmaya.com. Youngmaya.com accepts no responsibility legal or otherwise for their accuracy of content. Please report any inappropriate content to us, and we will evaluate it as a matter of priority.

For Promotion And advertising Contact (+233) 0549156794

LEAVE A REPLY

Please enter your comment!
Please enter your name here